UNDERGRADUATE INTERNSHIP PORTFOLIO

Page 1

SELECTED WORKS OF 2021-23

INTERNSHIP PORTFOLIO 1
PORTFOLIO
CHAHAK JAIN 2 CHAHAK JAIN jainchahak7@gmail.com +91 8369478064

I am a dedicated fourth-year student with a strong belief in the synergy of hard work and intelligent strategies for progress. My commitment to improvement is evident in my collaborative approach with people, aiding them in effective issue resolution and attaining rapid achievements. My conviction in the transformative power of passion underscores my philosophy that unwavering enthusiasm is the catalyst for turning potential into reality. My pursuit of excellence and dedication to facilitating positive change showcase my potential to make meaningful contributions in various domains. My journey reflects a blend of diligence, strategic thinking, and an unwavering belief in the potential of passion.

Education

2018

N.L Dalmia High School (ICSE)

Completed 10th

2020

Matushri Kashiben Vrajlal Valia International Vidyalaya - MKVVIV (CBSE)

Completed 12th

Ongoing Course, will be completed in 2025

Aditya College Of Architecture (Mumbai University)

B.arch Degree

Skills

- Teamwork

- Leadership

- Communication

- Management

Competitions

- ANDC Trophy 2021-22

- ANDC Trophy 2022-23

- GRIHA Trophy 2022-23

- G-SEN Trophy 2022-23

- CPK TROPHY 2022-23

- LIK TROPHY 2022-23

Experience

2015

- Elementary Drawing Grade Examination - Grade A

- Annual Training-cum-Social Service Camp - Junior Red Cross

-Organized and Participated in the events in the school

2018-20

- Organized and Participated in the events in the school

2021-22

- UNIT DESIGNEE in Second Year - NASA INDIA

- Organized and Participated in Events in College

- Collabarated With RADDI CONNECT for collecting recyclable waste in the College

- Attended Workshops and Seminars

- Started with an organization : GUARDIANS OF THE VALLEY

- Attended Annual National Convention in Banglore

2022-23

- UNIT SECRETARY in Third Year - NASA INDIA

- UDAAN FEST

- Organized PADHYATRA in Collabaration with other Colleges

Languages

- English

- Hindi

- Marvadi

- Marathi

- Gujarati

- REUBENS EXHIBITION 2022-23

- EXTREME HABITAT VOLUME ZERO 2022

- Organized OCEAN CLEAN UP DRIVE for the College

- Organized and Participated in Events in College

- Attended Workshops and Seminars

- Attended National Convention in Punjab

Documentation

2021

- Rumsu Village, Manali, Himachal Pradesh

2022

- Bada Bagh, Jaisalmer, Rajasthan

2023

- Our Lady Of Glory, Byculla, Mumbai

Softwares

INTERNSHIP PORTFOLIO 3
Autodesk Sketchup Canva Adobe Microsoft Office Enscape Autocad Revit Outlook Excel Word Power Point Photoshop Indesign Illustrator
CHAHAK JAIN 4
5 TABLE OF CONTENTS FRONT ELEVATION VENEER TEXTURE STONE FACADE CLADDING ROUGH SAND FACED PLASTER SURFACE FINISHED WITH PAINT ASIAN PAINTS APEX ULTIMA EUROPA VENEER TEXTURE STONE FACADE CLADDING ROUGH SAND FACED PLASTER SURFACE FINISHED WITH PAINT ASIAN PAINTS APEX ULTIMA EUROPA VENEER TEXTURE STONE FACADE CLADDING ROUGH SAND FACED PLASTER SURFACE FINISHED WITH PAINT ASIAN PAINTS APEX ULTIMA EUROPA VENEER TEXTURE STONE FACADE CLADDING ROUGH SAND FACED PLASTER SURFACE FINISHED WITH PAINT ASIAN PAINTS APEX ULTIMA EUROPA VENEER TEXTURE STONE FACADE CLADDING ROUGH SAND FACED PLASTER SURFACE FINISHED WITH PAINT ASIAN PAINTS APEX ULTIMA EUROPA +0.0M GROUND LEVEL +1.2M PLINTH LEVEL-2 +6.1M DOME LEVEL +7.5M DOME LEVEL +0.9M PLINTH LEVEL-1 01 03 INSTITUTIONAL LANDSCAPE 06 DOCUMENTATION 02 WORKING DRAWING 04 SALON DESIGN 07 MISCELLANOUS FASHION INSTITUTE

FASHION INSTITUTE MODA INSTITUTO

The site is located in Navi Mumbai.

Site Area - 20504SQ.M

Designing a fashion institute project gave insights into creating functional and inspiring spaces. Through this project, I grasped the significance of blending aesthetics with practicality, incorporating elements like spacious studios, cutting-edge classrooms, and fitting rooms. Understanding the flow of people within the building aids in crafting a dynamic layout. Attention to lighting, textures, and materials develops an atmosphere that resonates with the fashion world’s creativity. Balancing form and function, I learnt to harmonize architectural innovation with the specialized needs of a fashion institute, culminating in an educational environment that stimulates both learning and design inspiration.

CHAHAK JAIN 6
01
INTERNSHIP PORTFOLIO 7
VIEW
GROUND FLOOR PLAN
CHAHAK JAIN 8
TOP VIEW FIRST FLOOR PLAN SECOND FLOOR PLAN SECTION 01 SECTION 02 SECTION 03 SPILL OUT AREA MAIN ENTRANCE

LANDSCAPE DETAILS

INTERNSHIP PORTFOLIO 9
HARDSCAPE LANDSCAPE VIEW VIEW VIEW OUTDOOR SEATING VIEW VIEW VIEW
SOFTSCAPE

WORKING DRAWING

Creating working drawings equiped with essential skills for translating design concepts into practical, buildable structures. You’ll gain proficiency in accurately depicting dimensions, detailing, and specifications through plans, sections, elevations, and construction details. This process fosters a deep understanding of architectural scale, proportion, and spatial relationships. Collaborating with engineers and contractors hones your communication skills and enhances your grasp of interdisciplinary coordination. Mastery of materials, construction methods, and codes ensures your drawings adhere to safety and legal standards. Ultimately, working drawings empower you to bridge the gap between creative vision and construction reality, shaping your ability to bring architectural dreams to life.

CHAHAK JAIN 10 SETTING OUT PLAN ADJACENT PLOT 12 M WIDE ROAD RP1 BENCH MARK START POINT RP2 F.O.BA (0,0) E.O.B D C B 5110 BUILDING LINE PROPOSED BUILDING STILT 12 FLOORS CC01 CC59 CC58 CC57 CC56 CC55 CC54 CC53 CC52 CC51 CC50 CC49 CC48 CC47 CC46 CC42 CC41 CC40 CC39 CC38 CC37 CC36 CC35 CC34 CC33 CC32 CC31 CC16 CC17 CC18 CC19 CC20 CC21 CC22 CC23 CC24 CC25 CC26 CC27 CC28 CC29 CC30 CC04 CC05 CC06 CC07 CC08 CC09 CC10 ADJACENT PLOT ADJACENT PLOT CC11 CC15 CC03 CC02 +0.0 M 47260 CC12 CC13 CC14 UGT PLOT BOUNDARY CC45 CC44 CC43 ENTRY EXIT RP3 RP4
02
ADJACENT PLOT 12 M WIDE ROAD RP1 BENCH MARK START POINT RP2 CC01 CC59 CC58 CC57 CC56 CC55 CC54 CC53 CC52 CC51 CC50 CC49 CC48 CC47 CC46 CC42 CC41 CC40 CC39 CC38 CC37 CC36 CC35 CC34 CC33 CC32 CC31 CC16 CC17 CC18 CC19 CC20 CC21 CC22 CC23 CC24 CC25 CC26 CC27 CC28 CC29 CC30 CC04 CC05 CC06 CC07 CC08 CC09 CC10 ADJACENT PLOT ADJACENT PLOT CC11 CC15 CC03 CC02 +0.0 M +0.15 47260 CC12 CC13 CC14 UGT PLOT BOUNDARY CC45 CC44 CC43 ENTRY EXIT F.O.B (0,0) E.O.B PARKING PARKING PARKING PARKING PARKING PARKING 8 PARKING PARKING 3 PARKING 10 PARKING PARKING 11 BUILDING LINE RECREATIONAL GROUND SUBSTATION 5000 X 8000 8000M DRIVEWAY 8000M DRIVEWAY 6000M DRIVEWAY 8000M DRIVEWAY 10000 21000 C2 C1 C3 C5 C4 C7 C6 SW1 SW2 SW3 SW6 SW5 SW4 C8 C9 C10 C11 C12 C13 C14 C16 C17 C15 C18 C19 C23 C24 C25 C26 C20 C21 C22 GENERAL NOTES: CHAHAK ROLL No.: AR-20-018, ADITYA COLLEGE SCALE: CONTENTS OF THE SHEET: SIGNATURE OF STUDENT: TITLE OF DRAWING: PROJECT TITLE: SIGNATURE OF EXTERNAL JURY SIGNATURE OF PROFESSOR: WORKING DRAWING STILT FLOOR PLAN SHEET NO.: KEY PLAN: 04 N STAMP & CERTIFICATION OF COLLEGE: STILT FLOOR PLAN SCALE= 1:100 04 SCHEDULE OF COLUMNS: SR.NO COLUMN NO. CC-1, CC-2, CC-3, CC-4, CC-5, CC-6, CC-7, CC-8, CC-9, CC-10, CC-11, CC-12, CC-13, CC-14, CC-15, CC-16, CC-17, CC-18, CC-19, CC-20, CC-21, CC-22, CC-23, CC-24, CC-25, CC-26, CC-27, CC-28, CC-29, CC-30, CC-31, CC-32, CC-33, CC-34, CC-35, CC-36, CC-37, CC-38, CC-39, CC-40, CC-41, CC-42 CC-43, CC-44, CC-45, CC-46, CC-47, CC-48, CC-49, CC-50, CC-51, CC-52, CC-53, CC-54, CC-55, CC-56, CC-57, CC-58, CC-59 ALL DIMENSION ARE IN MILLIMETERS MENTIONED OTHERWISE. THE DRAWING SHALL NOT BE MEASURED. THE WRITTEN DIMENSIONS ARE STRICTLY INTERNAL BRICK WALLS ARE 115MM WALLS ARE 230MM THICK. BRICKS TO BE LAID WITH FROGS UPWARDS. DRIP MOULD TO BE PROVIDED TO ANY ALL DIMENSIONS ARE FROM UNFINISHED LEVELS ARE MENTIONED WITH REFERENCE LEVEL. ALL DRAWINGS TO BE CHECKED THOROUGHLY ENGINEER BEFORE THE EXECUTION ANY DISCREPANCIES ARISING SHALL NOTICE OF THE ARCHITECT OR CONSULTANT RECTIFIED BY THE ARCHITECT WITH WRITING BEFORE THE COMMENCEMENT THE DIMENSIONS OF STRUCTURAL MEMBERS,FOOTING SHALL BE AS PER THE DESIGN BY THE DESIGNER. STRUCTURAL DRAWINGS PREPARED ENGINEER SHALL BE REFERED FOR SCHEDULE OF WINDOWS & DOORS: WINDOW NO. WIDTH 2100MM W-2 1600MM W-3 SILL 600MM 1200MM 600MM D-2 D-3 1000MM D-5 750MM HEIGHT 2100MM 2100MM 2100MM DESCRIPTION :ALUMINIUM TYPE :ALUMINIUM DOUBLE SHUTTER SINGLE SHUTTER TYPE :ALUMINIUM D-1 1800MM W-6 900MM 400MM FINISHES SCHEDULE: 1200MM 600MM VITRIFIED TILES FROM RAK CERAMICS NOTATION 300MM 300MM VIRTIFIED ANTI SKID CERAMIC TILES FROM NITCO PRODUCT NAME BRIQUE GREY 600MM 600MM ANTI SKID VERTRIFIED TILES FROM RAK CERAMICS, PRODUCT CODE VEN CREMA 100MM VITRIFIED TILES FROM RAK CERAMICS 100MM VIRTIFIED ANTI SKID CERAMIC TILES FROM NITCO PRODUCT NAME BRIQUE GREY CERAMICS, PRODUCT CODE VEN CREMA F1 F2 F3 S1 S2 S3 FALSE CEILING WITH GYPSUM BOARDS PAINTED WITH ASIAN PAINTS PRODUCT CODE :8444 PRODUCT CODE :1090 C2 WALL PAINT FROM ASIAN PAINTS PRODUCT CODE 0942 WALL PAINT FROM ASIAN PAINTS PRODUCT CODE 0302 W3 WALL PAINT FROM ASIAN PAINTS PRODUCT CODE 8780 SCHEDULE OF COLUMNS: SR.NO COLUMN NO. SIZE QTY 2. C-12, C-13, C-14, C-15 C-1, C-2, C-3, C-8, C-9, C-10, C-11,C-16,C-17,C-18,C-19, C-20,C-21,C-22,C-23,C-24,C-25, C-26 300x600MM 18 SW-2, SW-3, SW-4, SW-5 C-5, C-6, C-7 C-4 4. 01 03 04 1440x300MM 1200x300MM 600x300MM 2330x300MM SW-1, SW-6 2400x300MM 04 02 STILT PLAN

TYPICAL FLOOR PLAN

REFUGEE FLOOR PLAN

INTERNSHIP PORTFOLIO 11 SERVICE SLAB SUNK:300MM CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION BEDROOM 3000 X 4350 BEDROOM 2700 3300 BEDROOM 3150 X 4050 BEDROOM 2400 X 3000 BEDROOM 3270 3830 BEDROOM 2700 X 3300 BEDROOM 3000 4350 BEDROOM 2620 X 3000 DUCT DUCT DUCT SERVICE SLAB SUNK:300MM DUCT DUCT SERVICE SLAB SUNK:300MM DUCT DUCT DUCT LIFT LIFT TOILET 3070 1500 SUNK 200MM TOILET 2540 X 1500 SUNK 200MM TOILET 2850 X 1500 SUNK 200MM TOILET 2600 1500 SUNK 200MM TOILET 2390 1730 SUNK 200MM TOILET 1940 1500 SUNK 200MM TOILET 2250 1720 SUNK 200MM TOILET 3070 1500 SUNK 200MM TOILET 2540 1500 SUNK 200MM BALCONY DRY BALCONY DRY BALCONY BALCONY BALCONY DRY BALCONY DRY BALCONY BALCONY W6 W6 W6 W6 W6 W6 W6 W6 W1 W2 W3 W1 KITCHEN 2540 2320 KITCHEN 2680 3000 KITCHEN 2535 2100 KITCHEN 2540 2320 2900X5700 LIVING ROOM 3115 4650 LIVING 2970 X 5020 W1 W2 W1 W2 W3 W1 W4 W3 W5 1270 1270 V1 W6 1270 1270 2970 X 5020 BALCONY 2100 1800 2100 1800 1 2 3 4 5 6 7 8 9 10 19 15 20 11 12 13 14 16 17 18 400 F.O.B (0,0) C2 (300 600) C1 (300 600) C3 (300 600) C4 (1200 600) C5 (1200 600) C6 C7 (1200 600) SW1 (2330 300) SW2 (2330 300) SW3 SW6 (2330 300) SW5 (2330 300) SW4 C8 C9 C10 (300 600) C11 (300 600) C12 (600 300) C13 (600 300) C14 (300 600) C15 C16 (300 600) C17 (600 300) C18 (300 600) C19 (300 600) C23 C24 (300 600) C25 (300 600) C26 (300 600) C20 (300 600) C21 C22 (300 600) 2320 3035 2455 600MM CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION LIVING ROOM LIVING ROOM CHAJJA PROJECTION CHAJJA PROJECTION W3 W3 W3 CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION W3 LEDGE WALL DOWN LOBBY 13340 1900 E.O.B SERVICE SLAB SUNK:300MM CHAJJA PROJECTION CHAJJA PROJECTION BEDROOM 3000 X 4350 BEDROOM 2700 X 3300 BEDROOM 3150 4050 BEDROOM 2400 3000 BEDROOM 3270 3830 BEDROOM 2620 X 3000 DUCT DUCT DUCT SERVICE SLAB SUNK:300MM DUCT DUCT SERVICE SLAB SUNK:300MM DUCT DUCT DUCT LIFT LIFT TOILET 3070 X 1500 SUNK 200MM TOILET 2540 X 1500 SUNK 200MM TOILET 2850 X 1500 SUNK 200MM TOILET 2390 1730 SUNK 200MM TOILET 1940 1500 SUNK 200MM TOILET 2250 1720 SUNK 200MM TOILET 3070 1500 SUNK 200MM TOILET 2540 1500 SUNK 200MM BALCONY DRY BALCONY DRY BALCONY BALCONY BALCONY DRY BALCONY W6 W6 W6 W6 W6 W6 W3 KITCHEN 2540 2320 KITCHEN 2680 X 3000 KITCHEN 2535 2100 2900X5700 LIVING ROOM 3115 X 4650 W3 W1 W4 W3 W1 W2 W5 W5 20 RISERS TO REACH HEIGHT OF 3000 MM THREAD:300MM ALL EQ 1270 1270 V1 W6 1270 1270 2970 5020 BALCONY 2100 1800 2100 1800 10 19 15 20 11 12 13 14 16 17 18 400 F.O.B (0,0) C2 C1 C4 C5 (2400 300) SW1 SW2 SW3 (2400 300) SW6 SW5 SW4 C8 (300 600) C9 (300 600) C10 C11 (300 600) C12 C13 (600 300) C14 C15 (600 300) C16 C17 C18 (300 600) C19 (300 600) C23 (300 600) C24 C25 C26 C20 (300 600) C21 (300 600) C22 2320 3035 2455 600MM CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION LIVING ROOM LIVING ROOM CHAJJA PROJECTION CHAJJA PROJECTION W3 W3 CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION LEDGE WALL LOBBY 13340 X 1900 E.O.B REFUGEE AREA C3 (300 600) C7 (1200 300) C6 (1200 300) SERVICE SLAB SUNK:300MM CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION BEDROOM 3000 4350 BEDROOM 2700 X 3300 BEDROOM 3150 4050 BEDROOM 2400 3000 BEDROOM 3270 X 3830 BEDROOM 2700 3300 BEDROOM 3000 X 4350 BEDROOM 2620 3000 DUCT DUCT DUCT SERVICE SLAB SUNK:300MM DUCT DUCT SERVICE SLAB SUNK:300MM DUCT DUCT DUCT LIFT LIFT TOILET 3070 X 1500 SUNK 200MM TOILET 2540 1500 SUNK 200MM TOILET 2850 1500 SUNK 200MM TOILET 2600 X 1500 SUNK 200MM TOILET 2390 X 1730 SUNK 200MM TOILET 1940 X 1500 SUNK 200MM TOILET 2250 X 1720 SUNK 200MM TOILET 3070 X 1500 SUNK 200MM TOILET 2540 X 1500 SUNK 200MM BALCONY DRY BALCONY DRY BALCONY BALCONY BALCONY DRY BALCONY DRY BALCONY BALCONY W6 W6 W6 W6 W6 W6 W6 W6 W1 W2 W3 W1 KITCHEN 2540 X 2320 KITCHEN 2680 X 3000 KITCHEN 2535 X 2100 KITCHEN 2540 X 2320 2900X5700 LIVING ROOM 3115 X 4650 LIVING 2970 5020 W1 W2 W1 W2 W3 W1 W4 W3 W5 1270 1270 V1 W6 1270 1270 2970 5020 BALCONY 2100 X 1800 2100 X 1800 10 19 15 20 11 12 13 14 16 17 18 400 F.O.B (0,0) C2 (300 600) C1 (300 600) C3 (300 600) C4 (1200 600) C5 (1200 600) C6 C7 (1200 600) SW1 (2330 300) SW2 (2330 300) SW3 SW6 (2330 300) SW5 (2330 300) SW4 C8 C9 C10 (300 600) C11 (300 600) C12 (600 300) C13 (600 300) C14 (300 600) C15 C16 (300 600) C17 (600 300) C18 (300 600) C19 (300 600) C23 C24 (300 600) C25 (300 600) C26 (300 600) C20 C21 C22 (300 600) 2320 3035 2455 600MM CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION LIVING ROOM LIVING ROOM CHAJJA PROJECTION CHAJJA PROJECTION W3 W3 W3 CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION W3 LEDGE WALL DOWN LOBBY 13340 X 1900 E.O.B SERVICE SLAB SUNK:300MM CHAJJA PROJECTION CHAJJA PROJECTION BEDROOM 3000 4350 BEDROOM 2700 3300 BEDROOM 3150 X 4050 BEDROOM 2400 X 3000 BEDROOM 3270 X 3830 BEDROOM 2620 3000 DUCT DUCT DUCT SERVICE SLAB SUNK:300MM DUCT DUCT SERVICE SLAB SUNK:300MM DUCT DUCT DUCT LIFT LIFT TOILET 3070 1500 SUNK 200MM TOILET 2540 1500 SUNK 200MM TOILET 2850 X 1500 SUNK 200MM TOILET 2390 X 1730 SUNK 200MM TOILET 1940 X 1500 SUNK 200MM TOILET 2250 X 1720 SUNK 200MM TOILET 3070 X 1500 SUNK 200MM TOILET 2540 X 1500 SUNK 200MM BALCONY DRY BALCONY DRY BALCONY BALCONY BALCONY DRY BALCONY W6 W6 W6 W6 W6 W6 W3 KITCHEN 2540 X 2320 KITCHEN 2680 3000 KITCHEN 2535 X 2100 2900X5700 LIVING ROOM 3115 4650 W3 W1 W4 W3 W1 W2 W5 W5 RISERS TO REACH HEIGHT 3000 MM THREAD:300MM ALL EQ 1270 1270 V1 W6 1270 1270 2970 X 5020 BALCONY 2100 X 1800 2100 X 1800 10 19 15 20 11 12 13 14 16 17 18 400 F.O.B (0,0) C2 C1 C4 C5 (2400 300) SW1 SW2 SW3 (2400 300) SW6 SW5 SW4 C8 (300 600) C9 (300 600) C10 C11 (300 600) C12 C13 (600 300) C14 C15 (600 300) C16 C17 C18 (300 600) C19 (300 600) C23 (300 600) C24 C25 C26 C20 (300 600) C21 (300 600) C22 2320 3035 2455 600MM CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION LIVING ROOM LIVING ROOM CHAJJA PROJECTION CHAJJA PROJECTION W3 W3 CHAJJA PROJECTION CHAJJA PROJECTION CHAJJA PROJECTION LEDGE WALL LOBBY 13340 1900 E.O.B REFUGEE AREA C3 (300 600) C7 (1200 300) C6 (1200 300) 04 06 07 08 09 10 11 13 04 06 07 08 09 10 11 12 13 05 05 00 01 02 00 BUILDING LINE E.O.B F.O.B (0,0) C2 C1 C3 03 03 C5 (1200 600) C4 (1440 300) C7 (1200 600) C6 (1200 300) (2400 300) SW1 (2330 300) SW2 (2330 300) SW3 (2400 300) SW6 (2330 300) SW5 (2330 300) SW4 C8 C9 C10 (300 600) C11 (300 600) C12 (600 300) C13 (600 300) C14 C16 (600 300) C17 C15 C18 C19 C23 C24 C25 C26 C20 (300 600) C21 (300 600) C22 (300 600) A A 0 0 C B C B D D F J H K L G P N M Q F J H K L G P N M Q C1 300 C4 720 SW1 4200 0 SW2 SW3 5515 C8 C9 C10 C11 6380 C12 C13 6530 C14 C15 8730 C16 C17 C18 C19 8880 SW4 SW5 9745 SW6 11060 C20 C21 C22 13390 C23 C24 C25 C26 14440 C2 C8 C16 C23 150 C5 C24 5930 C12 C14 6150 C4 C9 C17 C25 11810 C1 SW2 C26 15160 SW1 16210 SW4 16896 SW3 17260 SW6 17940 C6 C10 SW5 C20 18990 C18 22185 C13 24720 C7 C13 C21 24870 C19 C22 27720 C3 C11 30800 0 02 C2 C3 520 C5 C6 C7 825 12 14 14 E E C15 13990 1500 LIFT PIT E.O.B F.O.B (0,0) C1 C2 (300 600) C3 (300 600) C4 (1200 600) C5 C6 C7 (300 600) (2400 300) SW1 (2330 300) SW2 (2330 300) SW3 (2400 300) SW6 (2330 300) SW5 (2330 300) SW4 C8 C9 (300 600) C10 C11 (300 600) C12 (600 300) C13 (600 300) C14 (300 600) C15 (600 300) C16 (300 600) C17 C18 (300 600) C19 C23 (300 600) C24 (300 600) C25 (300 600) C26 C20 (300 600) C21 (300 600) C22 (300 600) F1 F2 F3 F4 F5 F7 F6 F8 F11 F9 F12 F10 SF-1 SF-2 F13 F14 F15 F17 F18 F19 F20 F21 F22 F23 F24 F25 PB-01 PB-02 PB-04 PB-08 PB-12 PB-13 PB-14 PB-15 PB-16 PB-17 PB-20 PB-21 PB-22 PB-24 PB-27 PB-31 PB-33 F16 1500 LIFT PIT 1500 LIFT PIT 1500 LIFT PIT 0 R 0 R 01 30950 BUILDING LINE
CENTERLINE TOILET DETAILS DUCT BASIN WATER CLOSET TILE DROP HEALTH FAUCET NAHNI TRAP SHOWER HEAD SLOPE W1 150 mm THICK R.C.C. SLAB 230x600 mm R.C.C. BEAM SQUIRE BELOW COUNTER BASIN GEYSER SINGLE LEVER BASIN MIXTURE FLOOR COUNTER BASIN MIRROR WALL MIXTURE (with provision of over head shower) 230 600 R. C. C BEAM 10 mm GLASS SHELF CERAMIC TILES (maxima series white, glossy finish) 200 mm THK SUNK NAPKIN HOLDER A A' D' D 150 mm THICK SLAB 230x600 mm R.C.C. BEAM CERAMIC TILES (maxima series white, glossy finish) 200 mm THK SUNK 10 mm GLASS SHELF NAPKIN HOLDER SINGLE LEVER BASIN MIXTURE OVAL BELOW COUNTER BASIN 2850 WATER CLOSET (hindware art crystal) START TILE WALL MIXTURE (with provision of over head shower 150 mm THICK SLAB 230x600 mm R.C.C. BEAM 200 mm THK SUNK GEYSER OVER HEAD SHOWER ALUMINIUM LOUVERED WINDOW BRICK WALL TOWEL ROD CERAMIC TILES (maxima serieswhite, glossy finish) D2 SERVICE SLAB SERVICE SLAB

FRONT ELEVATION

SECTION CC'

CHAHAK JAIN 12 FLUSHING FIRE FIGHTING DOMESTIC 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W5 W5 W4 W5 W4 W5 W4 W4 W5 W4 W5 SUNK BY 200MM W5 W4 W5 W4 W5 W4 SUNK BY 200MM W4 W6 W6 W6 W6 W6 W6 W6 W6 W6 W6 230 MM THK PARAPET WALL @1.2M HT
0.00 CAR RAMP LEVEL FIRST LEVEL 4000 SECOND LEVEL THIRD LEVEL 10000 FOURTH LEVEL FIFTH LEVEL 16000 SIXTH LEVEL SEVENTH LEVEL 22000 EIGHTH LEVEL NINTH LEVEL 28000 TENTH LEVEL ELEVENTH LEVEL 34000 TWELVETH LEVEL TERRACE LEVEL 40000 PARAPET LEVEL LMR LEVEL 44850 OVER HEAD TANK LEVEL 45350 W1 W3 VENEER TEXTURE STONE FACADE CLADDING ROUGH SAND FACED PLASTER SURFACE FINISHED WITH PAINT ASIAN PAINTS APEX ULTIMA EUROPA PCC COPING VENEER TEXTURE STONE FACADE CLADDING ROUGH SAND FACED PLASTER SURFACE FINISHED WITH PAINT ASIAN PAINTS APEX ULTIMA EUROPA VENEER TEXTURE STONE FACADE CLADDING ROUGH SAND FACED PLASTER SURFACE FINISHED WITH PAINT ASIAN PAINTS APEX ULTIMA EUROPA VENEER TEXTURE STONE FACADE CLADDING ROUGH SAND FACED PLASTER SURFACE FINISHED WITH PAINT ASIAN PAINTS APEX ULTIMA EUROPA VENEER TEXTURE STONE FACADE CLADDING ROUGH SAND FACED PLASTER SURFACE FINISHED WITH PAINT ASIAN PAINTS APEX ULTIMA EUROPA VENEER TEXTURE STONE FACADE CLADDING ROUGH SAND FACED PLASTER SURFACE FINISHED WITH PAINT ASIAN PAINTS APEX ULTIMA EUROPA ELEVATION SECTION

TERRACE FLOOR PLAN

TERRACE ABOVE OHT PLAN

INTERNSHIP PORTFOLIO 13 W4 W4 W4 SUNK BY 200MM W4 SUNK BY 200MM W4 W4 W4 SUNK BY 200MM W4 W4 SUNK BY 200MM W4 SUNK BY 200MM W4 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 230 MM THK PARAPET WALL @1.2M HT W4 W4 W4 SUNK 200MM W4 SUNK 200MM W4 W4 W4 SUNK 200MM W4 W4 SUNK 200MM W4 SUNK 200MM W4 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 W3 230 MM THK PARAPET WALL @1.2M HT F.O.B (0,0) E.O.B UP 230 MM THK PARAPET WALL @1.2M HT RWP-07 230 MM THK PARAPET WALL @1.2M HT RWP-11 RWP-05 RWP-04 RWP-10 RWP-09 RWP-06 RWP-01 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230MM THK BUND WALL @0.3M HT 230MM THK BUND WALL @0.3M HT MS LADDER FIRE FIGHTING TANK FLUSHING TANK DOMESTIC TANK 2486 2801 2801 1298 1237 2801 RISERS TO REACH HEIGHT 3000 MM RISERS:150MM THREAD:300MM ALL EQ UP LIFT MACHINE ROOM 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT RWP-08 RWP-10 RWP-06 PROJECTION 600 MM CHAJJA 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 1500 1500 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 1 2 3 4 5 6 7 8 9 10 19 15 20 11 12 13 14 16 17 18 3050 RWP-02 RWP-05 RWP-02 RWP-08 RWP-07 RWP-11 RWP-03 RWP-04 RWP-09 RWP-01 RWP-03 S1 C-2 S1 FRD F.O.B (0,0) E.O.B UP 230 MM THK PARAPET WALL @1.2M HT RWP-07 230 MM THK PARAPET WALL @1.2M HT RWP-11 RWP-05 RWP-04 RWP-10 RWP-09 RWP-06 RWP-01 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230MM THK BUND WALL @0.3M HT 230MM THK BUND WALL @0.3M HT MS LADDER FIRE FIGHTING TANK FLUSHING TANK DOMESTIC TANK PROJECTION 2486 2801 2801 1298 1237 2801 RISERS TO REACH RISERS:150MM UP LIFT MACHINE ROOM 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT RWP-08 RWP-10 RWP-06 600 MM CHAJJA PROJECTION 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 230 MM THK PARAPET WALL @1.2M HT 1500 1500 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 1 2 3 4 5 6 7 8 9 10 19 15 20 11 12 13 14 16 17 18 3050 RWP-02 RWP-05 RWP-02 RWP-08 RWP-07 RWP-11 RWP-03 RWP-04 RWP-09 RWP-01 RWP-03 S1 C-2 C-2 C-2 S1 FRD
SECTION

INSTITUTIONAL LANDSCAPE

Engaging in an institutional landscape project within architecture imparts crucial knowledge about harmonizing outdoor spaces with the institution’s purpose. This endeavor teaches us to balance aesthetics, functionality, and environmental sustainability. Understanding site analysis helps you optimize elements like pathways, seating, and greenery to encourage circulation and relaxation. Integrating local flora fosters ecosystem health and resilience. Mastery of hardscape materials and their integration with softscape elements enhances the overall experience. Collaborating with other disciplines, such as civil engineers, expands your interdisciplinary skills. Ultimately, the project develops your ability to transform outdoor areas into meaningful extensions of institutional identity, promoting well-being and fostering a sense of community.

CHAHAK JAIN 14 03
VIEW
VIEW
15 TOP VIEW VIEW VIEW VIEW
HARDSCAPE PLAN SOFTSCAPE PLAN

SALON DESIGN

Jūyō ni mieru - LOOKS MATTER

Designing the interior of a salon offers valuable insights into crafting inviting and functional spaces. This project teaches us how to optimize layouts for client flow, ergonomic workstations, and comfortable waiting areas. Incorporating appropriate lighting, color schemes, and materials enhances the ambiance and aligns with the salon’s branding. Thoughtful design of storage solutions for tools and products optimizes functionality. Understanding the spatial requirements for various salon services fosters efficient planning. Moreover, this project cultivates your ability to merge aesthetics with practicality, creating an environment that reflects the salon’s identity while prioritizing client comfort and stylist functionality.

CHAHAK JAIN 16 MAIN ENTRY EXISTING ROAD UP RACKS WALL DECOR WALL DECOR STORAGE UP NAIL COLOR DISPLAY RACKS NAIL STATION HAIR CUTTING STATIONS HAIR WASH STATIONS HAIR COLOR DISPLAY RACKS TOILET TOILET lockers LAUNDRY AND DRY CHANGING ROOM CHANGING ROOM CHANGING ROOM CHANGING ROOM MALE TOILET FEMALE TOILET GUEST TOILET PEDICURE AND MANICURE RECEPTION WAITING AREA STORAGE + PANAELLING WATER COOLER PANAELLING + STORAGE COMMON AREA STORAGE FISH PEDICURE staff seating PANTRY STORAGE SERVICE ENTRY SERVICE CORRIODOR 6200 G + 600 GROUND LEVEL 600 G 600 G 600 G 600 600 G + 750 G 750 G 950 G + 750 G 750 G 600 1350 G + 3150 CHANGING ROOM CHANGING ROOM SHOWER TOILET MALE TOILET STEAM SAUNA MALE MASSAGE COUPLE MASSAGE lockers UP WAITING AREA CHANGING ROOM BIN WAX ROOM STORAGE MALE MASSAGE FEMALE MASSAGE FEMALE MASSAGE TOILET SHOWER CHANGING ROOM CHANGING ROOM PASSAGE AREA lockers FEMALE TOILET G 600 G + 4600 G + 4600 4750 G 4750 4750 G 4750 G + 4750 G 4750 G 4930 G + 5110 G + 4930 5110 5290 G + 3150 G 4600 MAIN ENTRY EXISTING ROAD UP RACKS WALL DECOR WALL DECOR STORAGE UP NAIL COLOR DISPLAY RACKS NAIL STATION HAIR CUTTING STATIONS HAIR WASH STATIONS HAIR COLOR DISPLAY RACKS TOILET TOILET lockers LAUNDRY AND DRY CHANGING ROOM CHANGING ROOM CHANGING ROOM CHANGING ROOM MALE TOILET FEMALE TOILET GUEST TOILET PEDICURE AND MANICURE RECEPTION WAITING AREA STORAGE + PANAELLING WATER COOLER PANAELLING + STORAGE COMMON AREA STORAGE FISH PEDICURE staff seating PANTRY STORAGE SERVICE ENTRY SERVICE CORRIODOR 6200 G + 600 GROUND LEVEL 600 G 600 G 600 G 600 600 G + 750 G 750 G 950 G + 750 G 750 G 600 1350 G + 3150 CHANGING ROOM CHANGING ROOM SHOWER TOILET MALE TOILET STEAM SAUNA MALE MASSAGE COUPLE MASSAGE lockers UP WAITING AREA CHANGING ROOM BIN WAX ROOM STORAGE MALE MASSAGE FEMALE MASSAGE FEMALE MASSAGE TOILET SHOWER CHANGING ROOM CHANGING ROOM PASSAGE AREA lockers FEMALE TOILET G 600 G + 4600 G + 4600 4750 G 4750 4750 G 4750 G + 4750 G 4750 G 4930 G + 5110 G + 4930 5110 5290 G + 3150 G 4600 04
GROUND FLOOR PLAN FIRST FLOOR PLAN VIEW VIEW
INTERNSHIP PORTFOLIO 17 VIEW VIEW VIEW VIEW VIEW 600 8600 G 4600 G 600 GROUND LEVEL RAISED BY 150MM RAISED BY 300MM GROUND LEVEL 600 G 4600 G + 8600 VIEW SECTION 01 SECTION 02

COMPETITIONS

NASA INDIA

As a Unit Designee and Unit Secretary of Aditya College of Architecture affiliated with the National Association for Students of Architecture (NASA) India, my role assumes paramount significance in fostering a dynamic and collaborative environment within the architectural student community. Responsible for orchestrating the seamless functioning of the college’s involvement in NASA India, I wield a pivotal role in driving meaningful interactions and growth opportunities for budding architects.

My daily tasks encompassed a multifaceted array of responsibilities. I served as a conduit of communication, bridging the gap between your college and others across the nation, ensuring a vibrant exchange of ideas and insights. Coordinating workshops, seminars, and design competitions, I inspired and challenged students to push their creative boundaries. My role extended to meticulously planning and executing events that not only enrich architectural knowledge but also build lasting connections. Administratively, I was entrusted with record-keeping, scheduling, and liaising with other executive committee members, all of which require meticulous attention to detail and effective time management. By actively participating in decision-making processes.

This role is an exceptional platform to cultivate leadership, organizational, and communication skills. Nurturing a sense of camaraderie among architecture students, I facilitated an environment where talents flourish and innovation thrives. Your contributions amplify the impact of NASA India, enriching architectural discourse and propelling the aspirations of countless students. This journey not only enhances my own growth but also empowers me to shape the future of architectural education while fostering lifelong connections within the architectural community.

CHAHAK JAIN 18 05
INTERNSHIP PORTFOLIO 19

ANDC 2021-2022

Water-less or Water-more “Design radical ideas for extreme scenarios”

G-SEN

Water-less or Water-more “Design radical ideas for extreme scenarios”

ENTRY

CHAHAK JAIN
G-SEN G-SEN POSTCARDS
ANDC ENTRY

ANDC

Water-less or Water-more “Design radical ideas for extreme scenarios”

GRIHA

Water-less or Water-more “Design radical ideas for extreme scenarios”

ANDC ENTRY

INTERNSHIP PORTFOLIO 21
GRIHA ENTRY

DOCUMENTATION

Participating in architectural documentation teaches the essential skill of translating design concepts into comprehensive and actionable plans. This process involves creating detailed drawings, specifications, and written descriptions that guide construction and project realization. I gained proficiency in accurately representing dimensions, materials, and construction methods through drawings like floor plans, elevations, and sections. Documenting variations between design intent and construction reality improves problem-solving skills. Ultimately, architectural documentation ensures a seamless transition from vision to built reality, underscoring the importance of precision and effective communication in the field.

OUR LADY OF GLORY; BYCULLA, MUMBAI

CHAHAK JAIN 22 06
OUR LADY OF GLORY; BYCULLA, MUMBAI BADA BAGH; JAISALMER,RAJASTHAN RUMSU VILLAGE; MANALI, HIMACHAL PRADESH THE GATEWAY TO THE LORD
INTERNSHIP PORTFOLIO
VIEW SITE PLAN
THE SANTUARY OF PRAYERS

BADA BAGH, JAISALMER

CHAHAK JAIN 24 PLAN PLAN CHATTRI 9 CHATTRI 8 A A SECTION AA' SECTION AA' +900M PLINTH LEVEL ROOF LEVEL DOME LEVEL GROUND LEVEL ±0,0 +900MM PLINTH LEVEL ROOF LEVEL +2940M +4650M GROUND LEVEL ±0,0 +3200MM DOME LEVEL+4850MM SECTION AA' ±0.0M GROUND LEVEL +0.965M PLINTH LEVEL +3.545M ROOF LEVEL +7.17M DOME LEVEL +8.34M DOME LEVEL ±0.0M GROUND LEVEL +0.965M PLINTH LEVEL +3.545M ROOF LEVEL +7.17M DOME LEVEL +8.34M DOME LEVEL +0.965M ±0.0M +3.545M A A' REFLECTIVE CEILING PLAN FLOOR PLAN
236M 243M 242M 241M 240M 239M 238M 237M 236M 235M 234M 233M 232M 231M 230M MASTER PLAN REFLECTIVE CEILING PLAN ROOF PLAN FLOOR PLAN +0.6M +2.68M +2.68M SOUTH ELEVATION (SCALE 1:50)

RUMSU VILLAGE, MANALI

INTERNSHIP PORTFOLIO 25
PLAN SECTION EXOMETRIC VIEW VIEW VIEW VIEW ELEVATION

MISCELLANOUS

Within my architectural portfolio lie a myriad of experiences that illuminate my journey as an aspiring architect student. These diverse projects have sculpted my design perspectives throughtout the years. From designing commercial projects to delving into sustainable designs, each endeavor reflects my unwavering passion for creating spaces that harmonize aesthetics and functionality. The portfolio encapsulates my evolution, showcasing an adeptness at translating concepts into tangible structures. Through these pages, I aspire to convey not only my proficiency in architectural nuances but also my fervor for shaping environments that inspire and endure.

CHAHAK JAIN 26 07
INTERNSHIP PORTFOLIO 27
CHAHAK JAIN 28
INTERNSHIP PORTFOLIO 29
CHAHAK JAIN 30 CHAHAK JAIN jainchahak7@gmail.com +91 8369478064
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.